D. K. Chua
- CB-Contract: Case-Based Reasoning Approach to Construction Contract Strategy Formulation. Dans: Journal of Computing in Civil Engineering, v. 20, n. 5 (septembre 2006). (2006):
- Poisson Model of Construction Incident Occurrence. Dans: Journal of Construction Engineering and Management, v. 131, n. 6 (juin 2005). (2005):
- Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production. Dans: Journal of Construction Engineering and Management, v. 140, n. 2 (février 2014). (2014):
- Key Constraints Analysis with Integrated Production Scheduler. Dans: Journal of Construction Engineering and Management, v. 131, n. 7 (juillet 2005). (2005):