D. K. Chua
- CB-Contract: Case-Based Reasoning Approach to Construction Contract Strategy Formulation. In: Journal of Computing in Civil Engineering, v. 20, n. 5 (September 2006). (2006):
- Poisson Model of Construction Incident Occurrence. In: Journal of Construction Engineering and Management, v. 131, n. 6 (Juni 2005). (2005):
- Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production. In: Journal of Construction Engineering and Management, v. 140, n. 2 (Februar 2014). (2014):
- Key Constraints Analysis with Integrated Production Scheduler. In: Journal of Construction Engineering and Management, v. 131, n. 7 (Juli 2005). (2005):