Daegu Cho
- Prototype Development for BIM based Thermal Insulation and Condensation Performance Evaluation of Apartment Housings. Dans: Architectural Research, v. 17, n. 2 (juin 2015). (2015):
- Automatic Data Processing System for Integrated Cost and Schedule Control of Excavation Works in Natm Tunnels. Dans: Journal of Civil Engineering and Management, v. 20, n. 1 (mars 2014). (2014):
- Database Framework for Cost, Schedule, and Performance Data Integration. Dans: Journal of Computing in Civil Engineering, v. 27, n. 6 (novembre 2013). (2013):