Automatic Data Processing System for Integrated Cost and Schedule Control of Excavation Works in Natm Tunnels
Auteur(s): |
Daegu Cho
Hunhee Cho Daewon Kim |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, mars 2014, n. 1, v. 20 |
Page(s): | 132-141 |
DOI: | 10.3846/13923730.2013.801907 |
- Informations
sur cette fiche - Reference-ID
10354619 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019