S. O. Cheung
- Decision support system for contractor pre‐qualification—artificial neural network model. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000). (2000):
- Multi‐project cash flow optimization: non‐inferior solution through neuro‐multiobjective algorithm. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- An analysis of electricity end-use in air-conditioned office buildings in Hong Kong. Dans: Building and Environment, v. 38, n. 3 (mars 2003). (2003):
- Project Dispute Resolution Satisfaction Classification through Neural Network. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 1 (janvier 2000). (2000):
- Preliminary Measurements of Thermal and Visual Conditions in Shopping Malls in Hong Kong. Dans: Architectural Science Review, v. 44, n. 3 (septembre 2001). (2001):
- Capital Budgeting Evaluation Practices of Building Contractors in Hong Kong. Dans: Australasian Journal of Construction Economics and Building, v. 2, n. 1 (novembre 2002). (2002):
- Virtual Project Delivery System Adviser. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 4 (octobre 2007). (2007):
- Construction Delay Computation Method. Dans: Journal of Construction Engineering and Management, v. 127, n. 1 (février 2001). (2001):
- Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Dans: Construction Management and Economics, v. 18, n. 3 (avril 2000). (2000):
- Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Dans: Construction Management and Economics, v. 24, n. 11 (novembre 2006). (2006):
- Capital budget planning practices of building contractors in Hong Kong. Dans: Construction Management and Economics, v. 19, n. 6 (octobre 2001). (2001):
- An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Dans: Construction Management and Economics, v. 19, n. 1 (janvier 2001). (2001):
- A fuzzy neural network approach for contractor prequalification. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001). (2001):
- Genetic algorithm model in optimizing the use of labour. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001). (2001):
- Application of Delphi method in selection of procurement systems for construction projects. Dans: Construction Management and Economics, v. 19, n. 7 (novembre 2001). (2001):