- Novel A + Q Method for Improving Conventional Lowest Bid Contractor Selection Based on Post-performance Records. Dans: KSCE Journal of Civil Engineering, v. 28, n. 11 (3 octobre 2024). (2024):
- A Quantity-Based Method to Predict More Accurate Project Completion Time. Dans: KSCE Journal of Civil Engineering, v. 24, n. 10 (juillet 2020). (2020):
- The Use of a Multiple Risk Level Model to Tackle the Duration of Risk for Construction Activity. Dans: KSCE Journal of Civil Engineering, v. 23, n. 6 (mai 2019). (2019):
- Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 6 (août 2009). (2009):
- A model used in creating a work-rest schedule for laborers. Dans: Automation in Construction, v. 18, n. 6 (octobre 2009). (2009):
- Optimizing the schedule of dispatching RMC trucks through genetic algorithms. Dans: Automation in Construction, v. 13, n. 3 (mai 2004). (2004):
- A GA mechanism for optimizing the design of attribute double sampling plan. Dans: Automation in Construction, v. 16, n. 3 (mai 2007). (2007):
- An effective simulation mechanism for construction operations. Dans: Automation in Construction, v. 12, n. 3 (mai 2003). (2003):
- An integrated modeling mechanism for optimizing the simulation model of the construction operation. Dans: Automation in Construction, v. 15, n. 3 (mai 2006). (2006):
- Defect detection of concrete structures using both infrared thermography and elastic waves. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008). (2008):
- A hybrid mechanism for optimizing construction simulation models. Dans: Automation in Construction, v. 14, n. 1 (janvier 2005). (2005):
- Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 2 (avril 2012). (2012):