- Novel A + Q Method for Improving Conventional Lowest Bid Contractor Selection Based on Post-performance Records. In: KSCE Journal of Civil Engineering, v. 28, n. 11 (3 Oktober 2024). (2024):
- A Quantity-Based Method to Predict More Accurate Project Completion Time. In: KSCE Journal of Civil Engineering, v. 24, n. 10 (Juli 2020). (2020):
- The Use of a Multiple Risk Level Model to Tackle the Duration of Risk for Construction Activity. In: KSCE Journal of Civil Engineering, v. 23, n. 6 (Mai 2019). (2019):
- Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization. In: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 6 (August 2009). (2009):
- A model used in creating a work-rest schedule for laborers. In: Automation in Construction, v. 18, n. 6 (Oktober 2009). (2009):
- Optimizing the schedule of dispatching RMC trucks through genetic algorithms. In: Automation in Construction, v. 13, n. 3 (Mai 2004). (2004):
- A GA mechanism for optimizing the design of attribute double sampling plan. In: Automation in Construction, v. 16, n. 3 (Mai 2007). (2007):
- An effective simulation mechanism for construction operations. In: Automation in Construction, v. 12, n. 3 (Mai 2003). (2003):
- An integrated modeling mechanism for optimizing the simulation model of the construction operation. In: Automation in Construction, v. 15, n. 3 (Mai 2006). (2006):
- Defect detection of concrete structures using both infrared thermography and elastic waves. In: Automation in Construction, v. 18, n. 1 (Dezember 2008). (2008):
- A hybrid mechanism for optimizing construction simulation models. In: Automation in Construction, v. 14, n. 1 (Januar 2005). (2005):
- Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 2 (April 2012). (2012):