José Manuel Cardoso Teixeira
- (2024): Mitigating Making-Do Practices Using the Last Planner System and BIM: A System Dynamic Analysis. Dans: Buildings, v. 14, n. 8 (23 juillet 2024).
- Cost Overrun in Construction Projects in Developing Countries, Gas-oil Industry of Iran As A Case Study. Dans: Journal of Civil Engineering and Management, v. 23, n. 1 (janvier 2017). (2017):
- Training Needs in Construction Project Management: A Survey of 4 Countries of the Eu. Dans: Journal of Civil Engineering and Management, v. 12, n. 3 (septembre 2006). (2006):