Cost Overrun in Construction Projects in Developing Countries, Gas-oil Industry of Iran As A Case Study
Auteur(s): |
Roya Derakhshanalavijeh
José Manuel Cardoso Teixeira |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, janvier 2017, n. 1, v. 23 |
Page(s): | 125-136 |
DOI: | 10.3846/13923730.2014.992467 |
- Informations
sur cette fiche - Reference-ID
10354329 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019