- A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows. Dans: KSCE Journal of Civil Engineering. :
- (2021): Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach. Dans: Buildings, v. 11, n. 9 (25 août 2021).
- Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering. :
- Evaluating Efficiency in Construction Projects with the TOPSIS Model and NDEA Method Considering Environmental Effects and Undesirable Data. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (février 2022). (2022):
- Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Dans: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021). (2021):