- An optimized hybrid decision support system for waste management in construction projects based on gray data: A case study in high-rise buildings. In: Journal of Building Engineering, v. 80 (Dezember 2023). (2023):
- (2023): Identifying and Prioritizing the Challenges and Obstacles of the Green Supply Chain Management in the Construction Industry Using the Fuzzy BWM Method. In: Buildings, v. 13, n. 1 (13 Januar 2023).
- A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows. In: KSCE Journal of Civil Engineering, v. 26, n. 6 (April 2022). (2022):
- (2021): Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach. In: Buildings, v. 11, n. 9 (25 August 2021).
- Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 3 (April 2022). (2022):
- Evaluating Efficiency in Construction Projects with the TOPSIS Model and NDEA Method Considering Environmental Effects and Undesirable Data. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (Februar 2022). (2022):
- Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. In: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021). (2021):