- Standard Deviation of Bids for Construction Contract Auctions. Dans: Journal of Construction Engineering and Management, v. 147, n. 8 (août 2021). (2021):
- Stability and accuracy of deterministic project duration forecasting methods in earned value management. Dans: Engineering, Construction and Architectural Management. :
- (2021): The Relationship between Building Agents in the Context of Integrated Project Management: A Prospective Analysis. Dans: Buildings, v. 11, n. 5 (21 avril 2021).
- Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: a case study. Dans: Engineering, Construction and Architectural Management, v. 27, n. 8 ( 2020). (2020):
- Understanding the impact of environmental regulations on green technology innovation efficiency in the construction industry. Dans: Sustainable Cities and Society, v. 65 (février 2021). (2021):
- (2017): Structural Resistance of Reinforced Concrete Buildings in Areas of Moderate Seismicity and Assessment of Strategies for Structural Improvement. Dans: Buildings, v. 7, n. 4 (janvier 2017).
- Performance comparison of activity sensitivity metrics in schedule risk analysis. Dans: Automation in Construction, v. 106 (octobre 2019). (2019):
- Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. Dans: Automation in Construction, v. 84 (décembre 2017). (2017):
- Quick Abnormal-Bid-Detection Method for Construction Contract Auctions. Dans: Journal of Construction Engineering and Management, v. 141, n. 7 (juillet 2015). (2015):
- Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review. Dans: Construction Management and Economics, v. 33, n. 4 (juillet 2014). (2014):
- On the distribution of bids for construction contract auctions. Dans: Construction Management and Economics, v. 35, n. 3 (octobre 2016). (2016):
- Scoring Rules and Competitive Behavior in Best-Value Construction Auctions. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016). (2016):
- Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking. Dans: Automation in Construction, v. 97 (janvier 2019). (2019):