0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mehrdad Arashpour ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Rashidi, Ali / Maalim, Amjad Mohammed / Gutiérrez-Bucheli, Laura / Maxwell, Duncan / Arashpour, Mehrdad (2022): Evaluating the Effectiveness of BIM-based Virtual Reality for Coordinating the Design Disciplines in a Building Renovation Project. Dans: IOP Conference Series: Earth and Environmental Science, v. 1101, n. 3 (1 novembre 2022).

    https://doi.org/10.1088/1755-1315/1101/3/032019

  2. Xia, Xin / Xiang, Pengcheng / Khanmohammadi, Sadegh / Gao, Tian / Arashpour, Mehrdad (2024): Predicting Safety Accident Costs in Construction Projects Using Ensemble Data-Driven Models. Dans: Journal of Construction Engineering and Management, v. 150, n. 7 (juillet 2024).

    https://doi.org/10.1061/jcemd4.coeng-14397

  3. Machello, Chiara / Bazli, Milad / Rajabipour, Ali / Hadigheh, S. Ali / Rad, Hooman Mahdizadeh / Arashpour, Mehrdad / Hassanli, Reza (2024): FRP bar and concrete bond durability in seawater: A meta-analysis review on degradation process, effective parameters, and predictive models. Dans: Structures, v. 62 (avril 2024).

    https://doi.org/10.1016/j.istruc.2024.106231

  4. Kineber, Ahmed Farouk / Singh, Atul Kumar / Fazeli, Abdulwahed / Mohandes, Saeed Reza / Cheun"potg, Clara / Arashpour, Mehrdad / Ejohwomu, Obuks / Zayed, Tarek (2023): Modelling the Relationship Between Digital Twins Implementation Barriers and Sustainability Pillars: Insights from Building and Construction Sector. Dans: Sustainable Cities and Society, v. 99 (décembre 2023).

    https://doi.org/10.1016/j.scs.2023.104930

  5. Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emad / Bazli, Milad / Mohandes, Saeed Reza (2023): Ensemble machine learning framework for daylight modelling of various building layouts. Dans: Building Simulation, v. 16, n. 11 (septembre 2023).

    https://doi.org/10.1007/s12273-023-1045-x

  6. Doostmohamadi, Alireza / Shakiba, Milad / Bazli, Milad / Ebrahimzadeh, Mohsen / Arashpour, Mehrdad (2023): Enhancement of bond characteristics between sand-coated GFRP bar and normal weight and light-weight concrete using an innovative anchor. Dans: Engineering Structures, v. 294 (novembre 2023).

    https://doi.org/10.1016/j.engstruct.2023.116780

  7. Ben Seghier, Mohamed El Amine / Golafshani, Emadaldin Mohammadi / Jafari‐Asl, Jafar / Arashpour, Mehrdad (2023): Metaheuristic‐based machine learning modeling of the compressive strength of concrete containing waste glass. Dans: Structural Concrete, v. 24, n. 4 (5 juillet 2023).

    https://doi.org/10.1002/suco.202200260

  8. Shringi, Ankit / Arashpour, Mehrdad / Golafshani, Emadaldin Mohammadi / Dwyer, Tim / Kalutara, Pushpitha (2023): Enhancing Safety Training Performance Using Extended Reality: A Hybrid Delphi–AHP Multi-Attribute Analysis in a Type-2 Fuzzy Environment. Dans: Buildings, v. 13, n. 3 (26 février 2023).

    https://doi.org/10.3390/buildings13030625

  9. Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emad / Rashidi, Ali / Li, Heng (2023): Multi-objective optimization of shading devices using ensemble machine learning and orthogonal design of experiments. Dans: Energy and Buildings, v. 283 (mars 2023).

    https://doi.org/10.1016/j.enbuild.2023.112840

  10. Ding, Chenting / Bai, Yu / Fang, Yihai / Huang, Fengyi / Arashpour, Mehrdad (2022): A Focused Review of Modular Construction for Medical and Quarantine Facilities. Dans: Journal of Architectural Engineering (ASCE), v. 28, n. 4 (décembre 2022).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000565

  11. Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emadaldin Mohammadi / Hosseini, M. Reza / Chang, Victor / Zhou, Jenny (2022): Machine learning-based analysis of occupant-centric aspects: Critical elements in the energy consumption of residential buildings. Dans: Journal of Building Engineering, v. 46 (avril 2022).

    https://doi.org/10.1016/j.jobe.2021.103846

  12. Lee, Yee Sye / Rashidi, Ali / Talei, Amin / Arashpour, Mehrdad / Rahimian, Farzad Pour (2022): Integration of deep learning and extended reality technologies in construction engineering and management: a mixed review method. Dans: Construction Innovation, v. 22, n. 3 (mars 2022).

    https://doi.org/10.1108/ci-04-2022-0075

  13. Nasirian, Araz / Abbasi, Babak / Cheng, T. C. E. / Arashpour, Mehrdad (2022): Multiskilled Workforce Planning: A Case from the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 148, n. 5 (mai 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002279

  14. Mirzaee, Ali Mohammad / Hosseini, M. Reza / Martek, Igor / Rahnamayiezekavat, Payam / Arashpour, Mehrdad (2022): Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022).

    https://doi.org/10.1108/ecam-08-2021-0751

  15. Arashpour, Mehrdad / Heidarpour, Amin / Nezhad, Ali Akbar / Hosseinifard, Zahra / Chileshe, Nicholas / Hosseini, Reza (2019): Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality. Dans: Construction Management and Economics, v. 38, n. 6 (septembre 2019).

    https://doi.org/10.1080/01446193.2019.1616789

  16. Zhao, Ying / Chen, Wei / Arashpour, Mehrdad / Yang, Zhuzhang / Shao, Chengxin / Li, Chao (2021): Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Dans: Engineering, Construction and Architectural Management, v. 29, n. 4 (mai 2021).

    https://doi.org/10.1108/ecam-12-2020-1050

  17. Nikmehr, Bahareh / Hosseini, M. Reza / Rameezdeen, Raufdeen / Chileshe, Nicholas / Ghoddousi, Parviz / Arashpour, Mehrdad (2017): An integrated model for factors affecting construction and demolition waste management in Iran. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017).

    https://doi.org/10.1108/ecam-01-2016-0015

  18. Yang, Rebecca Jing / Jayasuriya, Sajani / Gunarathna, Chathuri / Arashpour, Mehrdad / Xue, Xiaolong / Zhang, Guomin (2018): The evolution of stakeholder management practices in Australian mega construction projects. Dans: Engineering, Construction and Architectural Management, v. 25, n. 6 (juillet 2018).

    https://doi.org/10.1108/ecam-07-2016-0168

  19. Hong, Ying / Hammad, Ahmed W. A. / Akbarnezhad, Ali / Arashpour, Mehrdad (2020): A neural network approach to predicting the net costs associated with BIM adoption. Dans: Automation in Construction, v. 119 (novembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103306

  20. Innella, Filomena / Arashpour, Mehrdad / Bai, Yu (2019): Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review. Dans: Journal of Construction Engineering and Management, v. 145, n. 12 (décembre 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001712

  21. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, EWM (2013): A new approach for modelling variability in residential construction projects. Dans: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (juin 2013).

    https://doi.org/10.5130/ajceb.v13i2.3120

  22. Khanzadi, Mostafa / Shahbazi, Mohammad M. / Arashpour, Mehrdad / Ghosh, Somik (2019): The Less Agents, the More Schedule Reliability: Examination of Single-Point Responsibility Model in Design Management. Dans: International Journal of Civil Engineering, v. 17, n. 8 (mars 2019).

    https://doi.org/10.1007/s40999-018-00389-9

  23. Arashpour, Mehrdad / Wakefield, Ron / Abbasi, Babak / Arashpour, Mohammadreza / Hosseini, Reza (2017): Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Dans: Architectural Engineering and Design Management, v. 14, n. 1-2 (décembre 2017).

    https://doi.org/10.1080/17452007.2017.1302406

  24. Mignone, Gerard / Hosseini, M. Reza / Chileshe, Nicholas / Arashpour, Mehrdad (2016): Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital. Dans: Architectural Engineering and Design Management, v. 12, n. 5 (juillet 2016).

    https://doi.org/10.1080/17452007.2016.1169987

  25. Nasirian, Araz / Arashpour, Mehrdad / Abbasi, Babak / Akbarnezhad, Ali (2019): Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Dans: Journal of Construction Engineering and Management, v. 145, n. 4 (avril 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001627

  26. Arashpour, Mehrdad / Bai, Yu / Aranda-mena, Guillermo / Bab-Hadiashar, Alireza / Hosseini, Reza / Kalutara, Pushpitha (2017): Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction. Dans: Automation in Construction, v. 84 (décembre 2017).

    https://doi.org/10.1016/j.autcon.2017.08.032

  27. Arashpour, Mehrdad / Wakefield, Ron / Abbasi, Babak / Lee, E. W. M. / Minas, James (2016): Off-site construction optimization: Sequencing multiple job classes with time constraints. Dans: Automation in Construction, v. 71 (novembre 2016).

    https://doi.org/10.1016/j.autcon.2016.08.001

  28. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Minas, James (2015): Optimization of process integration and multi-skilled resource utilization in off-site construction. Dans: Automation in Construction, v. 50 (février 2015).

    https://doi.org/10.1016/j.autcon.2014.12.002

  29. Arashpour, Mehrdad / Kamat, Vineet / Bai, Yu / Wakefield, Ron / Abbasi, Babak (2018): Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction. Dans: Automation in Construction, v. 95 (novembre 2018).

    https://doi.org/10.1016/j.autcon.2018.07.027

  30. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, E. W. M. (2014): Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (décembre 2014).

    https://doi.org/10.1139/cjce-2014-0199

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine