• DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Kim, Dae-Won / An, Sung-Hoon / Cho, Hunhee / Jeong, Jae-Weon / Lee, Bo-Hyeong / Doh, Nakju Lett / Kang, Kyung-In (2009): Development of conceptual model of construction factory for automated construction. Dans: Building and Environment, v. 44, n. 8 (août 2009).

    https://doi.org/10.1016/j.buildenv.2008.10.009

  2. An, Sung-Hoon / Kim, Gwang-Hee / Kang, Kyung-In (2007): A case-based reasoning cost estimating model using experience by analytic hierarchy process. Dans: Building and Environment, v. 42, n. 7 (juillet 2007).

    https://doi.org/10.1016/j.buildenv.2006.06.007

  3. Kim, Gwang-Hee / An, Sung-Hoon / Cho, Hun-Hee / Seo, Deok-Seok / Kang, Kyung-In (2005): Improved productivity using a modified table formwork system for high-rise building in Korea. Dans: Building and Environment, v. 40, n. 11 (novembre 2005).

    https://doi.org/10.1016/j.buildenv.2004.06.023

  4. Kim, Gwang-Hee / Yoon, Jie-Eon / An, Sung-Hoon / Cho, Hun-Hee / Kang, Kyung-In (2004): Neural network model incorporating a genetic algorithm in estimating construction costs. Dans: Building and Environment, v. 39, n. 11 (novembre 2004).

    https://doi.org/10.1016/j.buildenv.2004.03.009

  5. Kim, Gwang-Hee / An, Sung-Hoon / Kang, Kyung-In (2004): Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Dans: Building and Environment, v. 39, n. 10 (octobre 2004).

    https://doi.org/10.1016/j.buildenv.2004.02.013

  6. An, Sung-Hoon / Park, U-Yeol / Kang, Kyung-In / Cho, Moon-young / Cho, Hun-Hee (2007): Application of Support Vector Machines in Assessing Conceptual Cost Estimates. Dans: Journal of Computing in Civil Engineering, v. 21, n. 4 (juillet 2007).

    https://doi.org/10.1061/(asce)0887-3801(2007)21:4(259)

  7. Suk, Sung Joon / Chi, Seokho / Mulva, Stephen P. / Caldas, Carlos H. / An, Sung-Hoon (2016): Quantifying combination effects of project management practices on cost performance. Dans: KSCE Journal of Civil Engineering, v. 21, n. 3 (mai 2016).

    https://doi.org/10.1007/s12205-016-0499-0

  8. Yun, Seokheon / Cho, Hunhee / Tae, Yongho / Ahn, Bangryul / An, Sung-Hoon / Huh, Youngki (2011): Productivity analysis of steel works for cost estimation of public projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 16, n. 1 (décembre 2011).

    https://doi.org/10.1007/s12205-012-0812-5

  9. Shin, Yoonseok / An, Sung-Hoon / Cho, Hun-Hee / Kim, Gwang-Hee / Kang, Kyung-In (2008): Application of information technology for mass customization in the housing construction industry in Korea. Dans: Automation in Construction, v. 17, n. 7 (octobre 2008).

    https://doi.org/10.1016/j.autcon.2008.02.010

  10. Zhang, Zhen / Lee, Woo-Hwan / Choi, Young-Wha / An, Sung-Hoon (2013): A Comparative Analysis of Job Stress of Field Managers and Workers in Korean Construction Projects. Dans: Journal of Building Construction and Planning Research, v. 1, n. 3 ( 2013).

    https://doi.org/10.4236/jbcpr.2013.13008

Rechercher une publication...

Disponible seulement avec
Mon Structurae