Othman Subhi Alshamrani
- (2022): Factors Affecting Construction Productivity for Steel Rebar Work in Hot Climate Country. Dans: The Open Construction and Building Technology Journal, v. 16, n. 1 (3 février 2022).
- (2022): Integrated LCA-LCC assessment model of offsite, onsite, and conventional construction systems. Dans: Journal of Asian Architecture and Building Engineering, v. 21, n. 5 (avril 2022).
- Maintenance Budget Allocation Assessment Model Based on Integrated Post-occupancy Evaluation of Hospital Buildings. Dans: Journal of The Institution of Engineers (India): Series A, v. 102, n. 3 (12 juillet 2021). (2021):
- Initial cost assessment stochastic model for green buildings based on LEED score. Dans: Energy and Buildings, v. 245 (août 2021). (2021):
- Automated decision support system for selecting the envelope and structural systems for educational facilities. Dans: Building and Environment, v. 181 (août 2020). (2020):
- Initial Cost Forecasting Model of Mid-Rise Green Office Buildings. Dans: Journal of Asian Architecture and Building Engineering, v. 19, n. 6 (juin 2020). (2020):
- Integrated LCA–LEED sustainability assessment model for structure and envelope systems of school buildings. Dans: Building and Environment, v. 80 (octobre 2014). (2014):
- Life cycle assessment of low-rise office building with different structure–envelope configurations. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 3 (mars 2016). (2016):