Factors Affecting Construction Productivity for Steel Rebar Work in Hot Climate Country

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: The Open Construction and Building Technology Journal, , n. 1, v. 16
DOI: 10.2174/18748368-v16-e2206272
Abstrait:

Introduction

Construction industry is increasingly emphasizing productivity due to its effect on key performance indicators such as schedule, budget, and quality of work. This study aims to identify and rank the factors affecting the productivity of steel rebar work in construction projects in a hot climate. Among the activities involved in structural reinforced concrete work, fabricating and placing reinforced steel on a construction site is considered the most labor-intensive, outdoor, and time-consuming.

Methods

In this paper, an intensive qualitative literature review is conducted to identify the factors affecting the productivity of steel rebar work in concrete construction. Initially, forty factors were identified from the literature affecting the productivity of steel rebar work in Saudi Arabia. Final list of thirty-seven factors was used in the questionnaire survey. The identical nature and core content of these factors are clustered and grouped into five categories: technical, labor, management, external, and financial. As part of this study, fifty contractors working in the Saudi Arabian construction industry are recruited to participate and complete a structured pilot study questionnaire.

Results

The results of the questionnaire are weighted using the pairwise comparison method and then ranked based on the Analytic Hierarchy Process technique. The analysis of the thirty-seven factors results in a top ten list of the leading factors that directly impact the productivity of steel rebar work in concrete construction projects in Saudi Arabia. These factors are (1) humidity, (2) delay of salary, (3) sandstorms, (4) payment delay by client, (5) labor's low wage, (6) lack of financial incentives, (7) labor work experience and skills, (8) completeness of drawings, (9) poor labor relations, and (10) labor absenteeism. The general trend in these studies is that the factors tend to vary from jurisdiction to jurisdiction, from one construction project to another, and are directly related to the zone or country of construction.

Conclusion

These findings benefit stakeholders working in the concrete construction industry in Saudi Arabia, particularly project managers, project planners, cost estimators, and civil design and site engineers working on construction projects.

Copyright: © 2022 Mohammed Aldahash, Othman Subhi Alshamrani
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10701044
  • Publié(e) le:
    11.12.2022
  • Modifié(e) le:
    15.02.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine