Ahmed Yousry Akal
- (2022): A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners. Dans: Buildings, v. 12, n. 11 (27 octobre 2022).
- (2022): What Are the Readability Issues in Sub-Contracting’s Tender Documents?. Dans: Buildings, v. 12, n. 6 (7 juin 2022).
- Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 5 (septembre 2017). (2017):
- Proposed models to measure the quality of highway projects. Regression analysis vs statistical – fuzzy approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017). (2017):
- Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Dans: Engineering, Construction and Architectural Management, v. 28, n. 10 (février 2021). (2021):
- (2016): Management of Highway Projects in Egypt through Identifying Factors Influencing Quality Performance. Dans: Journal of Construction Engineering, v. 2016 ( 2016).