Ahmed Yousry Akal
- (2022): A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners. In: Buildings, v. 12, n. 11 (27 Oktober 2022).
- (2022): What Are the Readability Issues in Sub-Contracting’s Tender Documents?. In: Buildings, v. 12, n. 6 (7 Juni 2022).
- Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. In: Engineering, Construction and Architectural Management, v. 24, n. 5 (September 2017). (2017):
- Proposed models to measure the quality of highway projects. Regression analysis vs statistical – fuzzy approach. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017). (2017):
- Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (Februar 2021). (2021):
- (2016): Management of Highway Projects in Egypt through Identifying Factors Influencing Quality Performance. In: Journal of Construction Engineering, v. 2016 ( 2016).