Babak Abbasi
- Multiskilled Workforce Planning: A Case from the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 148, n. 5 (mai 2022). (2022):
- Nanoscale Stick-Slip Behavior of Na-Montmorillonite Clay. Dans: Journal of Engineering Mechanics (ASCE), v. 146, n. 12 (décembre 2020). (2020):
- Skill Set Configuration in Prefabricated Construction: Hybrid Optimization and Multicriteria Decision-Making Approach. Dans: Journal of Construction Engineering and Management, v. 145, n. 9 (septembre 2019). (2019):
- Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Dans: Architectural Engineering and Design Management, v. 14, n. 1-2 (décembre 2017). (2017):
- Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Dans: Journal of Construction Engineering and Management, v. 145, n. 4 (avril 2019). (2019):
- Off-site construction optimization: Sequencing multiple job classes with time constraints. Dans: Automation in Construction, v. 71 (novembre 2016). (2016):
- Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016). (2016):
- Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction. Dans: Automation in Construction, v. 95 (novembre 2018). (2018):
- Critical Literature Review of Labor Multiskilling in Construction. Dans: Journal of Construction Engineering and Management, v. 145, n. 1 (janvier 2019). (2019):