Babak Abbasi
- Multiskilled Workforce Planning: A Case from the Construction Industry. In: Journal of Construction Engineering and Management, v. 148, n. 5 (Mai 2022). (2022):
- Nanoscale Stick-Slip Behavior of Na-Montmorillonite Clay. In: Journal of Engineering Mechanics (ASCE), v. 146, n. 12 (Dezember 2020). (2020):
- Skill Set Configuration in Prefabricated Construction: Hybrid Optimization and Multicriteria Decision-Making Approach. In: Journal of Construction Engineering and Management, v. 145, n. 9 (September 2019). (2019):
- Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. In: Architectural Engineering and Design Management, v. 14, n. 1-2 (Dezember 2017). (2017):
- Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. In: Journal of Construction Engineering and Management, v. 145, n. 4 (April 2019). (2019):
- Off-site construction optimization: Sequencing multiple job classes with time constraints. In: Automation in Construction, v. 71 (November 2016). (2016):
- Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects. In: Journal of Construction Engineering and Management, v. 142, n. 1 (Januar 2016). (2016):
- Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction. In: Automation in Construction, v. 95 (November 2018). (2018):
- Critical Literature Review of Labor Multiskilling in Construction. In: Journal of Construction Engineering and Management, v. 145, n. 1 (Januar 2019). (2019):