0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Validation of a Model for Predicting Schedule Changes in Highway Work Zones—Case Studies

Auteur(s): (Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Transportation Engineering, , n. 8, v. 132
Page(s): 638-648
DOI: 10.1061/(asce)0733-947x(2006)132:8(638)
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)0733-947x(2006)132:8(638).
  • Informations
    sur cette fiche
  • Reference-ID
    10634754
  • Publié(e) le:
    29.11.2021
  • Modifié(e) le:
    29.11.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine