0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Validation of a Model for Predicting Schedule Changes in Highway Work Zones—Case Studies

Autor(en): (Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Transportation Engineering, , n. 8, v. 132
Seite(n): 638-648
DOI: 10.1061/(asce)0733-947x(2006)132:8(638)
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)0733-947x(2006)132:8(638).
  • Über diese
    Datenseite
  • Reference-ID
    10634754
  • Veröffentlicht am:
    29.11.2021
  • Geändert am:
    29.11.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine