Validation of a Model for Predicting Schedule Changes in Highway Work Zones—Case Studies
Autor(en): |
Praveen Sukumaran
(Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.)
Taehoon Hong (Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.) Mehmet Emre Bayraktar (Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.) Makarand Hastak (Project Engineer, Swinerton Builders, 865 S. Figueroa St., Suite 3000, Los Angeles, CA 90017-3009. E-mail: psukumaran@swinerton.com; formerly, Graduate Assistant.) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Journal of Transportation Engineering, August 2006, n. 8, v. 132 |
Seite(n): | 638-648 |
DOI: | 10.1061/(asce)0733-947x(2006)132:8(638) |
- Über diese
Datenseite - Reference-ID
10634754 - Veröffentlicht am:
29.11.2021 - Geändert am:
29.11.2021