Using BIM to Identify Claims Early in the Construction Industry: Case Study
Auteur(s): |
Mohamed Marzouk
(Associate Professor, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.)
Ahmed Othman (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt (corresponding author).) Mohamed Enaba (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.) Mohamed Zaher (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2018, n. 3, v. 10 |
Page(s): | 05018001 |
DOI: | 10.1061/(asce)la.1943-4170.0000254 |
- Informations
sur cette fiche - Reference-ID
10579895 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021