Using BIM to Identify Claims Early in the Construction Industry: Case Study
Autor(en): |
Mohamed Marzouk
(Associate Professor, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.)
Ahmed Othman (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt (corresponding author).) Mohamed Enaba (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.) Mohamed Zaher (Ph.D. Student, Structural Engineering Dept., Faculty of Engineering, Cairo Univ., Cairo 12613, Egypt.) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, August 2018, n. 3, v. 10 |
Seite(n): | 05018001 |
DOI: | 10.1061/(asce)la.1943-4170.0000254 |
- Über diese
Datenseite - Reference-ID
10579895 - Veröffentlicht am:
08.03.2021 - Geändert am:
08.03.2021