Understanding the cost of structural steelwork. Part 1: Initial estimates
Auteur(s): |
Chris Dolling
David Moore |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Structural Engineer, septembre 2020, n. 9, v. 98 |
Page(s): | 34-37 |
DOI: | 10.56330/vfen6953 |
Abstrait: |
Cost is a key consideration in many design decisions, so an understanding of approximate costs and cost drivers is a professional skill that structural engineers are advised to develop through their careers. This article is the first of two; it provides an introduction to initial cost estimates for structural steelwork and the key cost drivers in the early design stages of a project. The second article will present some best practice design guidance for optimising the cost of steel construction to provide best value during design development. |
- Informations
sur cette fiche - Reference-ID
10762787 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024