Understanding the cost of structural steelwork. Part 1: Initial estimates
Autor(en): |
Chris Dolling
David Moore |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | The Structural Engineer, September 2020, n. 9, v. 98 |
Seite(n): | 34-37 |
DOI: | 10.56330/vfen6953 |
Abstrakt: |
Cost is a key consideration in many design decisions, so an understanding of approximate costs and cost drivers is a professional skill that structural engineers are advised to develop through their careers. This article is the first of two; it provides an introduction to initial cost estimates for structural steelwork and the key cost drivers in the early design stages of a project. The second article will present some best practice design guidance for optimising the cost of steel construction to provide best value during design development. |
- Über diese
Datenseite - Reference-ID
10762787 - Veröffentlicht am:
23.03.2024 - Geändert am:
23.03.2024