0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Segmental Intelligent Model Test of Box Girder Bridge Strengthened By a Cable-Stayed System by Mathematical Calculation

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Physics: Conference Series, , n. 4, v. 2083
Page(s): 042051
DOI: 10.1088/1742-6596/2083/4/042051
Abstrait:

Dongming Yellow River Highway Bridge is an important super large bridge across the Yellow River on national highway 106. In order to effectively improve the cracking and deflection of the bridge, the cable-stayed system is used to reinforce the main girder of the project. In order to analyze the stress state of joist, bracket and box girder, the static loading of cable is carried out through scale model test to study the mechanical properties of concrete box girder segment, joist and bracket, verify the reliability of bracket and concrete box girder anchorage, and optimize the reinforcement method of cable-stayed system according to the test results.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1742-6596/2083/4/042051.
  • Informations
    sur cette fiche
  • Reference-ID
    10670989
  • Publié(e) le:
    28.05.2022
  • Modifié(e) le:
    28.05.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine