0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Segmental Intelligent Model Test of Box Girder Bridge Strengthened By a Cable-Stayed System by Mathematical Calculation

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Physics: Conference Series, , n. 4, v. 2083
Seite(n): 042051
DOI: 10.1088/1742-6596/2083/4/042051
Abstrakt:

Dongming Yellow River Highway Bridge is an important super large bridge across the Yellow River on national highway 106. In order to effectively improve the cracking and deflection of the bridge, the cable-stayed system is used to reinforce the main girder of the project. In order to analyze the stress state of joist, bracket and box girder, the static loading of cable is carried out through scale model test to study the mechanical properties of concrete box girder segment, joist and bracket, verify the reliability of bracket and concrete box girder anchorage, and optimize the reinforcement method of cable-stayed system according to the test results.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1742-6596/2083/4/042051.
  • Über diese
    Datenseite
  • Reference-ID
    10670989
  • Veröffentlicht am:
    28.05.2022
  • Geändert am:
    28.05.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine