Rock Mass Classification for Support System Design and Stand-up Time of Asahan 3 Hydroelectric Power Plant Tunnel (STA 7+085 - STA 7+717)

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1233
Page(s): 012011
DOI: 10.1088/1755-1315/1233/1/012011
Abstrait:

This Engineering geology research on rock mass classification to determine the support system’s design and stand-up time at the Asahan 3 hydroelectric tunnel STA 7+085 – STA 7+717 has not been thoroughly carried out in detail. This study aims to estimate the support requirements. Rock mass classification is determined through core drill observations and then analyzed by Q-system and RMR methods. The results show that the rock mass at the tunnel depth elevation consists of sandstone with good quality based on RMR and Q-system. Based on the Q system classification, good quality sandstone is obtained. Based on RMR, the suggested support system is shotcrete in the crown and rockbolt. Meanwhile, a rock bolt is the appropriate support system based on the Q-system. The use of an RMR based support system is recommended because it provides a higher level of security with the addition of shotcrete. The tunnel stand-up time is 2,200 - 2,700 hours based on RMR. The result of this research is expected to be applied in other tunnel construction having similar engineering geological condition.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1755-1315/1233/1/012011.
  • Informations
    sur cette fiche
  • Reference-ID
    10780293
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine