Rock Mass Classification for Support System Design and Stand-up Time of Asahan 3 Hydroelectric Power Plant Tunnel (STA 7+085 - STA 7+717)
Autor(en): |
A. Rochmadi
D. Karnawati |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | IOP Conference Series: Earth and Environmental Science, 1 August 2023, n. 1, v. 1233 |
Seite(n): | 012011 |
DOI: | 10.1088/1755-1315/1233/1/012011 |
Abstrakt: |
This Engineering geology research on rock mass classification to determine the support system’s design and stand-up time at the Asahan 3 hydroelectric tunnel STA 7+085 – STA 7+717 has not been thoroughly carried out in detail. This study aims to estimate the support requirements. Rock mass classification is determined through core drill observations and then analyzed by Q-system and RMR methods. The results show that the rock mass at the tunnel depth elevation consists of sandstone with good quality based on RMR and Q-system. Based on the Q system classification, good quality sandstone is obtained. Based on RMR, the suggested support system is shotcrete in the crown and rockbolt. Meanwhile, a rock bolt is the appropriate support system based on the Q-system. The use of an RMR based support system is recommended because it provides a higher level of security with the addition of shotcrete. The tunnel stand-up time is 2,200 - 2,700 hours based on RMR. The result of this research is expected to be applied in other tunnel construction having similar engineering geological condition. |
- Über diese
Datenseite - Reference-ID
10780293 - Veröffentlicht am:
12.05.2024 - Geändert am:
12.05.2024