Reuse of existing steel pile foundations – Greenock Creek Bridge, Walkerton, Ontario, Canada
Auteur(s): |
Tony Sangiuliano
(Ministry of Transportation of Ontario, Canada)
David Staseff (Ministry of Transportation of Ontario, Canada) PK Chatterji (Thurber Engineering Ltd, Oakville, Ontario, Canada) Keli Shi (Thurber Engineering Ltd, Oakville, Ontario, Canada) Rodolfo de Castro (Thurber Engineering Ltd, Oakville, Ontario, Canada) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Forensic Engineering, 1 juillet 2024, n. 3, v. 177 |
Page(s): | 1-8 |
DOI: | 10.1680/jfoen.22.00025 |
- Informations
sur cette fiche - Reference-ID
10711623 - Publié(e) le:
21.03.2023 - Modifié(e) le:
31.08.2024