0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Realisation of the High Speed Rail Project Nuremberg Ingoldstadt

Special Aspects of Design and Construction

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 17
Page(s): 18-21
DOI: 10.2749/101686607779938796
Abstrait:

The high speed rail Nuremberg – Ingolstadt in Germany has been in operation since May 2006. This paper presents an overview of the central lot, which included three tunnels with a total length of 15,6 km and three bridges. Out of these structures, the Irlahüll-tunnel is explained in more detail in this paper. This paper focuses on the numerous changes of design and construction method which had to be undertaken. These changes were mainly caused by differences between the predicted geological conditions and the situation encountered during construction. As an example, different karst cavities in the zone of the tunnels had to be dealt with and their effect on the structural behaviour of the tunnels had to be taken into account.

Ouvrages et projets

  • Informations
    sur cette fiche
  • Reference-ID
    10029115
  • Publié(e) le:
    18.08.2007
  • Modifié(e) le:
    30.09.2018
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine