0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Quantifying Time and User Cost Savings for Rapid Bridge Construction Technique

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 2151
Page(s): 11-20
DOI: 10.3141/2151-02
Abstrait:

The rapid bridge construction (RBC) technique is the most recent application of precast concrete technology. While time saving is the main advantage of this emerging technology, a major obstacle to adopting RBC is the common perception that it has a high initial cost. This paper presents a methodology for assessing the savings in time and user costs associated with adopting RBC techniques. A case study is also presented to demonstrate how the assessment methodology can be implemented. A comparison study was carried out to assess the performance of RBC through use of an actual bridge construction project. The results of this study indicate that RBC technology may offer a more efficient and economical alternative to the conventional method.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3141/2151-02.
  • Informations
    sur cette fiche
  • Reference-ID
    10778157
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine