Quantifying Time and User Cost Savings for Rapid Bridge Construction Technique
Auteur(s): |
Osama Abudayyeh
Hubo Cai Brock Mellema Sherif Yehia |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Transportation Research Record: Journal of the Transportation Research Board, janvier 2010, n. 1, v. 2151 |
Page(s): | 11-20 |
DOI: | 10.3141/2151-02 |
Abstrait: |
The rapid bridge construction (RBC) technique is the most recent application of precast concrete technology. While time saving is the main advantage of this emerging technology, a major obstacle to adopting RBC is the common perception that it has a high initial cost. This paper presents a methodology for assessing the savings in time and user costs associated with adopting RBC techniques. A case study is also presented to demonstrate how the assessment methodology can be implemented. A comparison study was carried out to assess the performance of RBC through use of an actual bridge construction project. The results of this study indicate that RBC technology may offer a more efficient and economical alternative to the conventional method. |
- Informations
sur cette fiche - Reference-ID
10778157 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024