0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Quantifying Time and User Cost Savings for Rapid Bridge Construction Technique

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 2151
Seite(n): 11-20
DOI: 10.3141/2151-02
Abstrakt:

The rapid bridge construction (RBC) technique is the most recent application of precast concrete technology. While time saving is the main advantage of this emerging technology, a major obstacle to adopting RBC is the common perception that it has a high initial cost. This paper presents a methodology for assessing the savings in time and user costs associated with adopting RBC techniques. A case study is also presented to demonstrate how the assessment methodology can be implemented. A comparison study was carried out to assess the performance of RBC through use of an actual bridge construction project. The results of this study indicate that RBC technology may offer a more efficient and economical alternative to the conventional method.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3141/2151-02.
  • Über diese
    Datenseite
  • Reference-ID
    10778157
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine