Quantifying Time and User Cost Savings for Rapid Bridge Construction Technique
Autor(en): |
Osama Abudayyeh
Hubo Cai Brock Mellema Sherif Yehia |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Transportation Research Record: Journal of the Transportation Research Board, Januar 2010, n. 1, v. 2151 |
Seite(n): | 11-20 |
DOI: | 10.3141/2151-02 |
Abstrakt: |
The rapid bridge construction (RBC) technique is the most recent application of precast concrete technology. While time saving is the main advantage of this emerging technology, a major obstacle to adopting RBC is the common perception that it has a high initial cost. This paper presents a methodology for assessing the savings in time and user costs associated with adopting RBC techniques. A case study is also presented to demonstrate how the assessment methodology can be implemented. A comparison study was carried out to assess the performance of RBC through use of an actual bridge construction project. The results of this study indicate that RBC technology may offer a more efficient and economical alternative to the conventional method. |
- Über diese
Datenseite - Reference-ID
10778157 - Veröffentlicht am:
12.05.2024 - Geändert am:
12.05.2024