Project Delivery Methods’ Change-Order Types and Magnitudes Experienced in Highway Construction
Auteur(s): |
Douglas Alleman
Arthur L. C. Antoine (Senior Project Manager, Shrewsberry, 2696 South Colorado Boulevard, Suite 460, Denver, CO 80222.) M. Scott Stanford (Assistant Professor, Dept. of Civil and Environmental Engineering, US Air Force Academy, 2354, Fairchild Dr., Suite 6J-159, Air Force Academy, CO 80840.) Keith R. Molenaar (Professor, Dept. of Civil, Environmental and Architectural Engineering, Univ. of Colorado Boulder, Boulder, CO 80309-0428.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, mai 2020, n. 2, v. 12 |
Page(s): | 04520006 |
DOI: | 10.1061/(asce)la.1943-4170.0000380 |
- Informations
sur cette fiche - Reference-ID
10580020 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021