Predicting Productivity Loss Caused By Change Orders Using the Evolutionary Fuzzy Support Vector Machine Inference Model
Auteur(s): |
Min-Yuan Cheng
Dedy Kurniawan Wibowo Doddy Prayogo Andreas F. V. Roy |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, juillet 2015, n. 7, v. 21 |
Page(s): | 881-892 |
DOI: | 10.3846/13923730.2014.893922 |
- Informations
sur cette fiche - Reference-ID
10354469 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019