0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Postconstruction Settlement Prediction of High Embankment of Silty Clay at Chengde Airport Based on One-Dimensional Creep Analytical Method: Case Study

Auteur(s): (Professor, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Graduate Student, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Graduate Student, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Associate Professor, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China (corresponding author).)
(Senior Engineer, China Airport Construction Group Corporation, Beijing 100101, China.)
(Engineer, China Airport Construction Group Corporation, Beijing 100101, China.)
Médium: article de revue
Langue(s): anglais
Publié dans: International Journal of Geomechanics, , n. 7, v. 18
Page(s): 05018004
DOI: 10.1061/(asce)gm.1943-5622.0001191
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)gm.1943-5622.0001191.
  • Informations
    sur cette fiche
  • Reference-ID
    10605868
  • Publié(e) le:
    08.05.2021
  • Modifié(e) le:
    08.05.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine