0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Postconstruction Settlement Prediction of High Embankment of Silty Clay at Chengde Airport Based on One-Dimensional Creep Analytical Method: Case Study

Autor(en): (Professor, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Graduate Student, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Graduate Student, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China.)
(Associate Professor, Dept. of Civil Engineering, Beihang Univ., Beijing 100191, China (corresponding author).)
(Senior Engineer, China Airport Construction Group Corporation, Beijing 100101, China.)
(Engineer, China Airport Construction Group Corporation, Beijing 100101, China.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: International Journal of Geomechanics, , n. 7, v. 18
Seite(n): 05018004
DOI: 10.1061/(asce)gm.1943-5622.0001191
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)gm.1943-5622.0001191.
  • Über diese
    Datenseite
  • Reference-ID
    10605868
  • Veröffentlicht am:
    08.05.2021
  • Geändert am:
    08.05.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine