New Songhua River Bridge: A Continuous Girder, Tied Arch, Hybrid Bridge with Four Rail Tracks in Harbin, China
Auteur(s): |
Gonglian Dai
Miao Su Wenshuo Liu Y. Frank Chen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Engineering International, août 2016, n. 3, v. 26 |
Page(s): | 254-259 |
DOI: | 10.2749/101686616x14555429843889 |