Integration building information modeling (BIM) to track the time for controlling of budget and labor productivity (case study: warehouse project)
Auteur(s): |
Rifqi Waladi Wicaksono
Juliastuti Putri Arumsari |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Earth and Environmental Science, 1 juillet 2021, n. 1, v. 794 |
Page(s): | 012037 |
DOI: | 10.1088/1755-1315/794/1/012037 |
Abstrait: |
The rapidly growing world of construction in Indonesia will require more effective support technology. Technological developments in construction are under construction called as Building Information Modeling (BIM). Before Developing Modeling Information (BIM), AutoCAD, SAP2000, Ms. Project is often used for design and project planning. The use of the applications cannot be integrated. It can be implemented as needed. Building Information Models (BIM) encourages the flow of 3D models across different disciplines, so that the process is faster and more direct. Currently, many actors have never adopted in the construction in Indonesia, even not yet understand about Building Information Modeling (BIM). The result of this study is the steel weight for the column is 1,151,596.35 kg. The duration of project with acceleration is 475 days. The labor productivity divided based on the experience, age and education. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée. |
0.86 MB
- Informations
sur cette fiche - Reference-ID
10781027 - Publié(e) le:
11.05.2024 - Modifié(e) le:
05.06.2024