0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Integration building information modeling (BIM) to track the time for controlling of budget and labor productivity (case study: warehouse project)

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 794
Seite(n): 012037
DOI: 10.1088/1755-1315/794/1/012037
Abstrakt:

The rapidly growing world of construction in Indonesia will require more effective support technology. Technological developments in construction are under construction called as Building Information Modeling (BIM). Before Developing Modeling Information (BIM), AutoCAD, SAP2000, Ms. Project is often used for design and project planning. The use of the applications cannot be integrated. It can be implemented as needed. Building Information Models (BIM) encourages the flow of 3D models across different disciplines, so that the process is faster and more direct. Currently, many actors have never adopted in the construction in Indonesia, even not yet understand about Building Information Modeling (BIM). The result of this study is the steel weight for the column is 1,151,596.35 kg. The duration of project with acceleration is 475 days. The labor productivity divided based on the experience, age and education.

Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 3.0 (CC-BY 3.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10781027
  • Veröffentlicht am:
    11.05.2024
  • Geändert am:
    05.06.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine