Improving project management “closeout” phase outcomes: evidence from a large general contractor in Iran using “X-inefficiency theory”
Auteur(s): |
Ali Mohammad Mirzaee
Igor Martek |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-11-2023-1161 |
- Informations
sur cette fiche - Reference-ID
10789111 - Publié(e) le:
20.06.2024 - Modifié(e) le:
20.06.2024