0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The early warning method of Dagangshan high-arch dam risk based on the time series prediction of the multivariate monitoring data

Auteur(s): (State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
(State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
(State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
ORCID (School of Civil Engineering, University of Science and Technology LiaoNing, Liaoning, Anshan, China)
(Reservoir and Dam Management Center of Guoneng Dadu River Basin Hydropower Development Co., Ltd., Sichuan, Chengdu, China)
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Health Monitoring
DOI: 10.1177/14759217241306989
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1177/14759217241306989.
  • Informations
    sur cette fiche
  • Reference-ID
    10812082
  • Publié(e) le:
    17.01.2025
  • Modifié(e) le:
    17.01.2025
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine