0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The early warning method of Dagangshan high-arch dam risk based on the time series prediction of the multivariate monitoring data

Autor(en): (State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
(State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
(State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Liaoning, Dalian, China)
ORCID (School of Civil Engineering, University of Science and Technology LiaoNing, Liaoning, Anshan, China)
(Reservoir and Dam Management Center of Guoneng Dadu River Basin Hydropower Development Co., Ltd., Sichuan, Chengdu, China)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Health Monitoring
DOI: 10.1177/14759217241306989
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1177/14759217241306989.
  • Über diese
    Datenseite
  • Reference-ID
    10812082
  • Veröffentlicht am:
    17.01.2025
  • Geändert am:
    17.01.2025
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine