Doing More with Less: Application to Transmission Structures
Auteur(s): |
Marlon W. Vogt
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Open Civil Engineering Journal, décembre 2017, n. 1, v. 11 |
Page(s): | 768-777 |
DOI: | 10.2174/1874149501711010768 |
Abstrait: |
Introduction:Common theme within the electric utility industry is doing more work with fewer resources. Shrinking staff resources and budgets create challenges in light of the continuing strong investment required for national lifeline infrastructure projects. Methods:The presentation will define and address one traditional type of waste – overproduction, particularly applied to the design of electric utility transmission structures. Results and Conclusion:It will illustrate a variety of typical design choices and the risks in making design decisions that result in larger than necessary, and thus more expensive, structures. |
Copyright: | © 2017 Marlon W. Vogt |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.46 MB
- Informations
sur cette fiche - Reference-ID
10175222 - Publié(e) le:
02.08.2019 - Modifié(e) le:
02.06.2021