0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Doing More with Less: Application to Transmission Structures

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Civil Engineering Journal, , n. 1, v. 11
Seite(n): 768-777
DOI: 10.2174/1874149501711010768
Abstrakt:

Introduction:

Common theme within the electric utility industry is doing more work with fewer resources. Shrinking staff resources and budgets create challenges in light of the continuing strong investment required for national lifeline infrastructure projects.

Methods:

The presentation will define and address one traditional type of waste – overproduction, particularly applied to the design of electric utility transmission structures.

Results and Conclusion:

It will illustrate a variety of typical design choices and the risks in making design decisions that result in larger than necessary, and thus more expensive, structures.

Copyright: © 2017 Marlon W. Vogt
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10175222
  • Veröffentlicht am:
    02.08.2019
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine