Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study
Auteur(s): |
Ming Shan Ng
(Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland)
Konrad Graser (Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland) Daniel Mark Hall (Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Architectural Engineering and Design Management, février 2021, n. 1, v. 19 |
Page(s): | 1-17 |
DOI: | 10.1080/17452007.2021.1956417 |
- Informations
sur cette fiche - Reference-ID
10625687 - Publié(e) le:
26.08.2021 - Modifié(e) le:
20.02.2023