Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study
Autor(en): |
Ming Shan Ng
(Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland)
Konrad Graser (Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland) Daniel Mark Hall (Innovative and Industrial Construction, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Architectural Engineering and Design Management, Februar 2021, n. 1, v. 19 |
Seite(n): | 1-17 |
DOI: | 10.1080/17452007.2021.1956417 |
- Über diese
Datenseite - Reference-ID
10625687 - Veröffentlicht am:
26.08.2021 - Geändert am:
20.02.2023