- Bug or feature? Institutional misalignments between construction technology and venture capital. In: Construction Management and Economics. :
- Sustainable Future-Proof Healthcare Facilities: Modular and Adaptable Design Approach. In: Journal of Management in Engineering (ASCE), v. 40, n. 6 (November 2024). (2024):
- Qualitative technology evaluation of digital fabrication with concrete: Conceptual framework and scoreboard. In: Automation in Construction, v. 154 (Oktober 2023). (2023):
- DFAB HOUSE: implications of a building-scale demonstrator for adoption of digital fabrication in AEC. In: Construction Management and Economics, v. 39, n. 10 (September 2021). (2021):
- Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study. In: Architectural Engineering and Design Management, v. 19, n. 1 (Februar 2021). (2021):
- Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall. In: Automation in Construction, v. 92 (August 2018). (2018):
- National Museum of Qatar. In: Stahlbau, v. 86, n. 4 (April 2017). (2017):