Determinants of Transaction Costs in Construction Projects
Auteur(s): |
Huimin Li
David Arditi Zhuofu Wang |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, mai 2015, n. 5, v. 21 |
Page(s): | 548-558 |
DOI: | 10.3846/13923730.2014.897973 |
- Informations
sur cette fiche - Reference-ID
10354496 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019